阻燃地胶施工工艺流程
英文回答:
Fire-Retardant Flooring Installation Process Flow.
1. Substrate Preparation.
Ensure the substrate is smooth, level, and free of
debris.
Repair any cracks or holes in the substrate.
Prime the substrate to enhance adhesion.
2. Adhesive Application.
Select a high-quality adhesive specifically designed
for fire-retardant flooring.
Apply the adhesive evenly using a trowel with
appropriate notched size.
3. Flooring Installation.
Install the fire-retardant flooring tiles or sheets
according to the manufacturer's instructions.
Ensure proper alignment and spacing during
installation.
4. Rolling and Compaction.
Use a heavy roller or compactor to apply pressure and
ensure proper adhesion between the flooring and adhesive.
Repeat the rolling process several times to achieve
optimal bonding.
5. Welding (Seams)。
For sheet or roll flooring, welding is required to
create seamless joints.