1 PURPOSE
The hydraulic and leak test shall be conducted for Cargo Tanks according todrawing and design
requirements to inspect the integral mechanicalproperty and tightness property and verify that the
safety properties of theCargo Tanks conform to requirements.
2 RULES FOR THE HYDRAULIC AND LEAK TEST
GL rules shall be followed, the rules of GB 150-, Chapter 10.9 may beconsidered.
During the test and inspection additional safety regulations have to beobserved.
3 SUPPORTS
3.1 Temporary supports
During hydrostatic test the bullets may be supported by temporary and design of
the temporary supports shall consider the maximumload requirements of the soil.
Drawings of the temporary supports and of their arrangement under theTank shall be submitted to
SMC for approval.
In order to avoid surface damages of the tanks, the top surface of thetemporary supports shall be
equipped with a layer of softwood.
3.2 Settlement
Theodolites shall be used for measuring the foundation settlement. Thereshall be one monitoring
point on each side of the tank above the supports. Atthe start of the test procedure, all monitoring
points shall be in one line withthe accompanying theodolite.
The total number of monitoring points shall be not less than 6.
The settlements shall be recordedbefore start of water filling
at 1/3 water filling
at 2/3 water filling
at complete water filling
during complete water filling every 10 minutes.
The water filling shall be interrupted if the settlement of one monitoring pointis found to exceed 10
mm or if the differential setting of two neighbouredmonitoring points exceeds 5 mm.
4 HYDROSTATIC TEST AND LEAK TEST
4.1 The area for test
The area for hydrostatic test and leak test will be the final assembly site ofcargo tanks. The area
shall be symbolized with safety protection and safetyidentification, and inspected and approved by
chief engineer and safetymanager.
During the complete test procedure, only authorized personnel related to thetests shall be allowed to
stay near the tanks.
4.2 Test water
4.2.1 Water quality
Test water shall have at least industrial water quality. The chloride contentshall not exceed 25 ppm.
In case that harbour water will be used, high pressure fresh water washingof all tank internals and
surfaces shall be carried out straight after the tankshave been discharged from the test water.
Afterwards the tank shall be airdried completely.
4.2.2 Water temperature
The temperature of the water used for the test shall be at least 15 °C duringthe whole test procedure
until all water is drained off.
4.2.3 Ambient conditions
The hydrostatic test shall take place in dry weather condition.
For ambient temperatures below 0 °C it must be ensured that neither thewater inside the vessel, nor
manometers and filling lines can freeze. It isrecommended to carry out the hydrostatic test
procedure at an ambienttemperature above +5 °C.
It is recommended to carry out the hydrostatic test (test pressure) at daytime.
If the natural lighting conditions are not sufficient, extra lighting facilitiesmust be provided to
ensure that coming-out water can be detectedimmediately and that all readings can be done
correctly.
4.3 Test equipment
4.3.1 Pumps
Filling water pumps shall have appropriate capacities in order to fill the tankwithin the shortest
possible time. The soil conditions and the symmetricalsettlement of all supports shall limit the
filling rate.
The pressurizing pump shall have a minimum capacity of 20 m³/h at 3.0Pa(g) with appropriate and
safe hose connections. The pump must beable to maintain the test pressure at Zero flow rate.
4.3.2 Safety valve
On one of the tank nozzles a safety relief valve shall be installed with a setpressure of 1.2 MPa(g).
The size of the safety valve shall be sufficient tolead off the flow of the pressurizing pump.
4.3.3 Temporary blind flanges
Nozzles which are not equipped with their original blind flanges at the time ofthe hydrostatic test
shall be closed with temporary blind flanges. Thetemporary blind flanges shall be provided by
manufacturer.
4.3.4 Temporary gaskets
Flanged connections which are not equipped with their original gaskets atthe time of the hydrostatic
test shall be closed with suitable temporarygaskets. The temporary gaskets shall be provided by
manufacturer
4.3.5 Shut-off valves
All butt-welded nozzles shall be equipped with the original shut-off valves inorder to avoid welding
after hydrostatic test.
4.3.6 Local pressure gauge
Three calibrated and certified local pressure gauges of the same measuringrange shall be placed on
different nozzles:
Measuring range: approx. 6.5 Bar (g) (min. 4.875 Bar(g), max. 13 Bar(g))
Accuracy: 60 kPa over the full range
Minimum dial diameter: 100 mm
4.3.7 Remote controlled pressure indication and recorder
A remote controlled pressure transmitter may be placed on one tank nozzle:
Indicator: Digital
Accuracy: Class 0.1
4.3.8 Temperature indication
The temperature inside and outside the tank shall be measured andrecorded during the hydrostatic