2024年4月16日发(作者:包过滤防火墙)
解压密码(Password)
Unzip password:
Data introduction, you can continue to improve the introduction,
earn gold coin project management software Primavera 3.1
stand-alone version, is project level
P3 3.1 features
Engineering model
The engineering team, the project and the target project are
not limited
Each project can reach up to 100 thousand processes
Automatic schedule calculation and resource balancing
Progress lights, automatic lights, and automatic progress
updates
Show progress line, forward line
20 level work breakdown structure (WBS) coding
Engineering identification coding
Job classification code defined by 24 users,
Can be used for selection, sorting, and grouping analysis
Intelligent job node code classification
16 user defined data items
A number of projects are summarized into new projects
Earned value analysis, evaluation, completion
Save history data
Merge multiple projects
The overall update is used to modify batch data at a time
User defined planning template (subnet)
Real simultaneous multi user function: multiple people update,
analyze and make reports at the same time
Multiple levels of authority can be assigned to the project
Compatible with Microsoft Office graphics
User interface
Schedule calculation
Critical path method (CPM) calculation
Single node network diagram (PDM) mode
发布者:admin,转转请注明出处:http://www.yc00.com/xitong/1713254303a2212805.html
评论列表(0条)