套管式换热器操作流程

套管式换热器操作流程


2024年4月10日发(作者:)

套管式换热器操作流程

英文回答:

Operation Procedure for Shell and Tube Heat Exchanger.

Pre-Operation Checks:

Verify that the heat exchanger is properly installed

and connected.

Ensure that the piping system is free of leaks and

obstructions.

Check the valves for proper operation and ensure they

are in the correct positions.

Inspect the gaskets and seals for any damage or

deterioration.

Start-Up Procedure:

Slowly open the inlet valve to the shell side of the

heat exchanger.

Allow the shell side to fill with fluid and vent any

trapped air through the vent valve.

Close the vent valve once the shell side is full.

Gradually open the inlet valve to the tube side of the

heat exchanger.

Allow the tube side to fill with fluid and vent any

trapped air through the vent valve.

Close the vent valve once the tube side is full.

Operation Monitoring:

Monitor the inlet and outlet temperatures of both

fluids.


发布者:admin,转转请注明出处:http://www.yc00.com/web/1712752953a2116426.html

相关推荐

发表回复

评论列表(0条)

  • 暂无评论

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信