酒店风管机安装流程
英文回答:
Hotel Air Handling Unit Installation Procedure.
1. Pre-Installation.
Verify the location of the air handling unit (AHU) and
ensure that it is accessible for maintenance and inspection.
Check the electrical connections to ensure that they
are compatible with the AHU's requirements.
Inspect the ductwork to ensure that it is properly
sized and installed according to the manufacturer's
specifications.
2. Installation.
Position the AHU in its designated location and secure
it according to the manufacturer's instructions.
Connect the ductwork to the AHU's inlet and outlet
ducts.
Install any additional accessories, such as filters,
dampers, and controls.
3. Electrical Connections.
Connect the AHU's electrical wiring to the electrical
supply.
Verify that the connections are secure and that the
AHU is properly grounded.
4. Refrigerant Piping.
If the AHU includes a refrigerant system, connect the
refrigerant piping to the AHU's compressor and evaporator.
Charge the system with the specified refrigerant and