酒店风管机安装流程

酒店风管机安装流程


2024年4月23日发(作者:)

酒店风管机安装流程

英文回答:

Hotel Air Handling Unit Installation Procedure.

1. Pre-Installation.

Verify the location of the air handling unit (AHU) and

ensure that it is accessible for maintenance and inspection.

Check the electrical connections to ensure that they

are compatible with the AHU's requirements.

Inspect the ductwork to ensure that it is properly

sized and installed according to the manufacturer's

specifications.

2. Installation.

Position the AHU in its designated location and secure

it according to the manufacturer's instructions.

Connect the ductwork to the AHU's inlet and outlet

ducts.

Install any additional accessories, such as filters,

dampers, and controls.

3. Electrical Connections.

Connect the AHU's electrical wiring to the electrical

supply.

Verify that the connections are secure and that the

AHU is properly grounded.

4. Refrigerant Piping.

If the AHU includes a refrigerant system, connect the

refrigerant piping to the AHU's compressor and evaporator.

Charge the system with the specified refrigerant and


发布者:admin,转转请注明出处:http://www.yc00.com/news/1713829667a2327063.html

相关推荐

发表回复

评论列表(0条)

  • 暂无评论

联系我们

400-800-8888

在线咨询: QQ交谈

邮件:admin@example.com

工作时间:周一至周五,9:30-18:30,节假日休息

关注微信