Scope of Supply list for Hyco plants
No.
I.
1
LINDE AG Process Engineering and Contracting Division
Project Management
Provide project manager & engineering staff
项目管理
组建项目组,任命项目经理和组员
协调程序
2
3
4
5
6
7
8
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
IV.
1
2
Prepare project schedule
Prepare/maintain equipment/materials schedule
Issue monthly progress reports
Issue operating & mainenance manuals
Provide quality control
Provide required site services
Overall process responsibility
Process Design Package
Basis of design
Process description
General design requirements
Local and client codes and standards
Heat and material balance for 100% and 50% loads
Block flow diagram
Process flow diagrams (PFD's)
Equipment list with sizing and recommended material of
construction
Piping & instrument diagrams (P&ID's)
Line designation table
Equipment specifications - vessels
Equipment specifications - heat exchangers, heaters
Equipment specifications - machinery, motors
Duty specifications - instrumentation
Electrical load list
Utility and chemical list - including intermittent services
Summary of plant effluents / emmissions
List of recommended equipment suppliers
description of the safety system
safety recommendations
description of the process control system
basic operating manual
General Engineering
Specification of all consumable materials
Complete lubrication schedule
Local Safety regulations
Plant site information
HAZOP study
Mechanical data manuals (4 copies)
Process data manuals (4 copies)
Documentation in electronical form (2 CD copies)
Recommended spare parts list
Noise emmission information
Plot plan and 3-D model
Plot plan showing area clasification / Gas detection
Control room
MCC building
Down stream Ref pressure to be constant
no step change in design pressure.
Boiler feed water treatement
Instrument air unit
Container for Instrument air unit
Cooling water unit
Flare Design
SelectiveCatalyticRecovery design
SelectiveNonCatalyticRecovery design
Refinery fuel gas import case
Import H2 rich gas, purification
H2-fuel-recycle
authority engineeering
Civil / Structural Design
Site plan and equipment arrangement
Soils analysis
锅炉水处理
仪表气体单元
仪表气体单元缓冲器
冷却水单元
火炬设计
选择性催化剂回收设计
选择性非催化剂回收设计
炼厂燃料气引进
富H2气引进和纯化
H2燃料循环
工程审批
土建结构设计
总图和设备排布
地质分析
工艺设计包
基础设计
工艺描述
总的设计条件
地方、用户标准和规范
100%和50%的物料能量平衡
流程简图
PFD
有尺寸和材质的设备清单
PID
管线命名表
贮罐设备条件
换热器设备条件
动设备数据表
仪表条件表
电器负荷表
确定项目进度表
设备、材料进度表
发布月度进展计划
发布操作和维护手册
质量控制
现场服务设施
整个流程职责
Standard list version 0
公用工程和化学品清单(包括间歇过程)
工厂外排物料汇总表(液体/气体)
推荐设备商清单
安全系统描述
安全建议
工艺控制系统描述
初步操作手册
详细工程
所有消耗材料的规格
制造完成进度
地方安全规定
工厂现场信息
HAZOP分析
机械数据手册(4本)
工艺数据手册(4本)
电子版文件(2份)
推荐的设备备件表
产生噪声信息
布置和3-D模型
分区和气体检测布置图
控制室
电气、仪表机柜室
File: / WBS
1 of 6
Scope of Supply list for Hyco plants
No.
3
4
5
6
7
8
9
10
11
Site preparation
Storm water drainage
Fire water loop
Finish grading, roads & paving inside BL
Finish grading, roads & paving outside BL
Foundation loadings
Foundation design, based on soil report
Structural eng & design dwgs - for reformer
Structural eng & design dwgs - ISBL piperacks, platforms, cable
trays, equipment supports, stairs, handrails, pipe supports.
Anchor bolt schedule
Anchor bolt patterns for each equipment > 3 bolts
Equipment skid design
Piping Design
Equipment arrangements
All pipe runs
Underground pipe routing (tie-ins)
Above ground ISBL piping detail design (tie-ins)
Piping supplied ISBL
Detailed design of all pipe supports
Stress analysis of piping
Spec & design of any expansion joints, flex hoses, spring
supports, etc.
Pulsation studies
Electrical Design
One line diagram for power distribution
Area classification drawing
Schematic wiring diagrams
Electrical design drawings inside battery limits
- above ground conduit
- wire, cable, conduit sizing
- plant lighting
- area lighting
- grounding
Electrical physical drawings, mounting details and location
drawings
ISBL Conduit routing drawings
Cable schedule
Interconnecting wiring diagrams
Heat tracing design
Instrument Design
Instrument summary
Specify DCS I/O counts
- 4-20 MA inputs to DCS
- 4-20 MA outputs to DCS
- digital inputs to DCS (dry contacts)
- digital outputs from DCS
- thermocouple millivolt inputs to DCS
- inputs to DCS
Complete configuration of DCS
DCS control strategy
Instrument loop sheets
Instrument physical detail drawings
- mounting and support
- tubing hookups
- tubing routing diagrams (show hookups)
- instrument locatons and elevatons
- instrument data sheets
- wiring from primary instruments to junction boxes
Complete PLC system
Burner management equipment/Trip system design
PSA control logic for PLC with Automatic start
Other shutdown req. in the form of wiring dia's
Power requirements for all local panels and identification of UPS
power requirements
基础负荷
LINDE AG Process Engineering and Contracting Division
现场准备
暴雨排水
防火水池
界区内
Standard list version 0
整合器结构和工程图纸
结构设计图纸、管廊、平台、电缆槽架,设备支撑、楼梯、扶手
、管线支撑
底脚螺栓吉化
每个地脚螺栓的排布图
设备吊装设计
管道设计
设备布置
所有管道
地下布管(接头)
地上ISBL管道详细设计(接头)
界区内管道
所有管道支撑的详细设计
管道应力分析
膨胀节、弯管、弹簧支撑的选型和设计
脉动分析
电气设计
配电单线图
区域分级图纸
接线示意图
界区内电气设计
地上线管
导线、电缆、线管尺寸
装置照明
地下采光
接地
电气实线图,安装细节和位置图纸
界区内管路走向图
电缆铺设进度表
连锁布线图
电伴热设计
仪表设计
仪表概述
DCS I/O详细数据
DCS 4-20MA输入
DCS 4-20MA输出
DCS数据输入(干式接点)
DCS数据输出
DCS热电偶毫伏输入
DCS其他输入
DCS组态完成
DCS控制系统
仪表回路表
DCS实线详图
安装和支架
管路连接点
管线走向图(带连接点的)
仪表位置及标高
仪表数据表
主要仪表分线柜布线
PLC系统完成
燃烧器管理设备/跳车系统设计
PLC自动启动的变压吸附逻辑关系
其他硬连线停车要求
就地式仪表及UPS功率需求
12
13
14
V.
1
2
3
4
5
6
7
8
9
VI.
1
2
3
4
4.01
4.02
4.03
4.04
4.05
5
6
7
8
9
VII.
1
2
2.01
2.02
2.03
2.04
2.05
2.06
3
4
5
6
6.01
6.02
6.03
6.04
6.05
6.06
7
8
9
10
11
File: / WBS
2 of 6
发布者:admin,转转请注明出处:http://www.yc00.com/news/1713829356a2326997.html
评论列表(0条)