2024年4月12日发(作者:)
干式变压器铁芯叠片流程
The process of stacking laminations for dry-type transformer cores is
a crucial aspect of transformer manufacturing. 在干式变压器生产过程
中,铁芯叠片的流程是非常关键的。
Firstly, the selection of high-quality silicon steel material is essential
for the performance and reliability of the transformer. 首先,选择优质
的硅钢材料对于变压器的性能和可靠性至关重要。
Each lamination has to be precisely cut, ensuring the accurate
dimensions and minimal air gaps between the laminations. 每个叠片
都必须精确切割,确保尺寸准确,叠片之间的空气间隙尽量减少。
The stacking process requires skilled labor and attention to detail to
ensure the proper alignment and tight binding of the laminations. 叠
片的堆叠过程需要熟练的劳动力和对细节的关注,以确保叠片的正确对齐和
紧密绑定。
Furthermore, the insulation between laminations is critical to prevent
the occurrence of short circuits and ensure the safety and reliability
of the transformer. 此外,叠片之间的绝缘对于防止短路的发生以及确保
变压器的安全性和可靠性至关重要。
The final step involves the pressing and bonding of the laminations
using high pressure and temperature, creating a solid core for the
transformer. 最后的步骤涉及使用高压和高温对叠片进行压制和粘接,为变
压器创建一个坚固的铁芯。
In conclusion, the process of stacking laminations for dry-type
transformer cores is a critical and intricate process that requires
precision, skill, and attention to detail. 总之,干式变压器铁芯叠片的流
程是一个关键且复杂的过程,需要精密度、技能和对细节的关注。
发布者:admin,转转请注明出处:http://www.yc00.com/news/1712933020a2150672.html
评论列表(0条)